Tel Aviv Metro Line M3

Tel Aviv Metro Line M3

A major underground transportation project connecting Bat Yam in the south with Herzliya in the north through the eastern Gush Dan metropolitan area: a 39-kilometer line with 25 stations, tunnels, shafts, technical facilities and associated infrastructure.

Key facilities include the Ariel Sharon Park Crossover and Station, a railway track junction connecting the mainline to the depot, and the Or Yehuda Depot – the line's operations and maintenance hub.

  • 39 Line length (km)
  • 25 Metro stations
  • 200.9 Ariel Sharon Park Crossover M3016 (m long; 29 m wide, 26.15 m high)
  • 4–5 Ariel Sharon Park Station M3017 – underground levels (165 × 29 m)
  • ~200 Track Junction Portal M3018 (m, above ground)
  • 17 Or Yehuda Depot (buildings and structures)
  • Structural Engineering, Landscape Design Yenon
  • Structural Engineering
  • Structural Engineering